Malmö
City Government, Private Sector
Neighborhood or district
Ongoing since 2010
Varvsstaden is the redevelopment of Malmö's former shipyard area into a mixed-use district of 2,500 homes, 4,000 workspaces, schools and green space.
Led by the private developer Varvsstaden AB in close collaboration with the City of Malmö, the project combines heritage-protected regeneration with a circular economy approach: existing industrial buildings are retained and adapted, and materials from structures that cannot be kept are catalogued in an on-site "Material Bank" for reuse elsewhere in the area. A set of non-binding orientation documents (the Urban Life Compass, Aesthetic Compass and Catalogue of Ideas) sits alongside the City's statutory planning framework, allowing a flexible collaboration between public and private actors over the long development period.

© Malmö City | Varvsstaden Project
Varvsstaden was selected for the EU's Living Spaces catalogue through an open call for good practices in 2023, and was later chosen for an on-site peer-learning visit in Malmö in October 2024. This case study draws on research originally produced for Living Spaces, a Creative Europe programme implemented by Eurocities and the Architects' Council of Europe.
Malmö, Sweden's third-largest city, faced severe industrial decline from the 1970s to the 1990s, driven above all by the collapse of its shipbuilding industry. Its Western Harbour was home for the Kockums Mechanical Workshops, once one of the world's largest shipyards with around 6,000 employees, that ended ship manufacturing in Malmö in 1986. From 1994, Mayor Ilmar Reepalu steered the city towards a knowledge-based economy, of which the Öresund Bridge (2000) and the founding of Malmö University now stand as particular icons. The redevelopment of the Western Harbour is also part of this change with the Varvsstaden project becoming yet another symbol of this new, post-industrial identity.
The Western Harbour's transformation began with the Bo01 housing expo (2001), an early showcase of sustainable urban design that nonetheless drew criticism for limited affordability and social inclusion. The 18-hectare site of Varvsstaden is the next phase of this transformation, under deliberate City of Malmö stewardship since 2010. Unlike Bo01's largely clean-slate approach, Varvsstaden tries to preserve the industrial heritage and reuse existing buildings and materials, under the motto "Varvsstaden is being built from Varvsstaden".
The project's stated objectives are to create a vibrant, mixed-use inner-city district of around 2,500 homes and 4,000 workspaces, schools and green space; to retain and adapt the area's most characterful industrial structures for commercial, cultural and educational use; and to minimise the environmental footprint of new construction by maximising material reuse.
Governance structure
Varvsstaden AB, jointly owned by the private companies Peab and acts as both developer and contractor and oversees the full 25-year development period. It works in close, continuous collaboration with the City of Malmö's City Planning Office and other departments (Streets and Property, Environmental Department, Malmö Museums, local area offices), which integrate public interest and community needs into the process.
Planning framework
Development is framed by three statutory layers: a Comprehensive Plan, a Planning Programme and a Development Plan. These strategic documents set out land use, density, traffic and environmental principles without imposing direct legal obligations; legally binding Detail Plans translate these principles into enforceable building volumes, uses and infrastructure requirements, with individual buildings requiring their own planning permission. The Planning Programme originated from joint seminars between the City and developers starting in 2008; the Development Plan was produced by the City Planning Office between June 2012 and April 2014 in collaboration with developers, consultants and city departments.
Guiding 'compasses'
Development proceeds in phases: a new phase begins only once residents of the previous phase have settled, allowing the project to adapt as it learns. This value- and process-based approach favours ongoing dialogue and feedback among stakeholders over a fixed masterplan.
The Material Bank
Large-scale industrial sheds that cannot be retained are dismantled, with materials such as steel frames and plates, windows, bricks, stairs and lamps stored on-site and digitally catalogued (condition, structural properties, carbon footprint) for reuse in new construction within Varvsstaden. Architects are encouraged to design with these available materials from an early stage, with a target of reusing or recycling 80% of on-site materials, estimated to save around 30,000 tonnes of CO2 emissions.
Public spaces, including bridges, parks and roads, are funded by the City of Malmö, with a budget of approximately half a billion Swedish kronor (around €43.1 million). Individual commercial and residential development budgets are managed separately by Varvsstaden AB.
On staffing, Varvsstaden AB maintains a core project team of five to six people. City of Malmö staff involvement has varied by phase: around 20 municipal employees were directly or indirectly engaged during the plan development phase, reducing to two to three employees during detailed planning stages.
According to a “Peer-learning Visit Report” by the European Commission from 2025, the financing models for material banks were still under development. Participants discussed options including management of stored materials by local authorities, private companies or a non-profit public-private consortium, and regulatory levers such as internalising environmental costs (for example via EU taxonomy rules or a carbon tax), tax reductions for contractors using reused materials, or Infrastructure Development Charges requiring developers to contribute to the public infrastructure their projects necessitate. A phased development approach is also used to spread infrastructure costs over time, with early phases focused on essential infrastructure and later phases funded by revenues from earlier ones.
Because Varvsstaden is still under construction (development ongoing since 2017, within a 25-year horizon), full outcome data on housing delivery, employment creation, social inclusion or realised CO2 savings is not yet available.
Varvsstaden offers a transferable model for cities seeking to combine heritage regeneration with circular construction, provided governance and financing structures are adapted to context.
European Commission, Directorate-General for Education, Youth, Sport and Culture (2025). Sustainable urban regeneration in Malmö – Peer-learning visit report. Living Spaces – Cities and regions shaping the built environment for everyone. Publications Office of the European Union. ISBN 978-92-68-20366-8, doi:10.2766/54261
European Commission, Living Spaces catalogue (2024). Malmö: from shipyards to sustainable living in Varvsstaden. https://culture.ec.europa.eu/cultural-and-creative-sectors/architecture/living-spaces/catalogue/malmo
Varvsstaden AB. Official website. https://www.varvsstaden.se/
City of Malmö. Varvsstaden, Västra Hamnen. https://malmo.se/Stadsutveckling/Stadsutvecklingsomraden/Vastra-Hamnen/Varvsstaden.html